Saturday, September 23, 2023
  • About Us
  • ImagiNATION
  • Rate Card
  • Contact Us
The Nation Online
Advertisement
  • Home
  • News
  • Politics
  • Business
  • Entertainment
  • Life & Style
    • Every Woman
      • Soul
      • Family
    • Religion
    • Feature
  • Society
  • Columns
  • Sports
  • Enation
No Result
View All Result
  • Home
  • News
  • Politics
  • Business
  • Entertainment
  • Life & Style
    • Every Woman
      • Soul
      • Family
    • Religion
    • Feature
  • Society
  • Columns
  • Sports
  • Enation
No Result
View All Result
No Result
View All Result
Home Business Business News

Firms in long wait for normal power supply

by Grace Phiri
17/03/2023
in Business News, Front Page
3 min read
0
Share on FacebookShare on TwitterShare on WhatsAppShare on LinkedinLinkedinShare via Email

Businesses will have to wait longer for the resumption of normal electricity supply following the devastating impact of Tropical Cyclone Freddy which has affected generation, worsening the already challenging power supply status.

The storm has led to intermittent power supply over the past six days, taking away another 56 megawatts (MW) from the national power grid. This has left Electricity Generation Company (Egenco) with 231MW against an estimated total hydro power generation 390MW.

The current deficit is on top of another one caused by the damage to Kapichira Hydro Power Station in January last year by Tropical Cyclone Ana, which knocked off 129MW from the national power grid.

Speaking in an interview yesterday, Malawi Confederation of Chambers of Commerce and Industry president Lekani Katandula said businesses are already languishing due to inadequate power supply and the much higher cost of using diesel-powered generators.

Tropical Cyclone Freddy caused trees to fall on power transmission lines

He said: “Though understandable looking at Tropical Cyclone Freddy impact, this will add to the enormous challenges already being faced by the business community.

“We can only hope that the recovery works will be expedited and efforts to make our infrastructure more resilient prioritised thereafter.”

Chamber for Small and Medium Businesses Association executive secretary James Chiutsi said small-scale enterprises have been struggling amidst erratic power supply in the past one year.

He said this has suppressed productivity of SMEs who employ about 1.6 million people and are a catalyst for development.

Said Chiutsi: “For the country to develop, small-scale enterprises require electricity to do small-scale production.

“You know very well that SMEs are the ones that feed into the big corporation. Now the persistent power outages obviously mean that corporates are affected as well.”

He said the small firms are sailing through tough times as their production capacity has gone back several years.

Commenting on the same, National Working Group on Trade Policy chairperson Frederick Changaya observed that businesses suffer exogenous downtime due to prolonged blackouts.

He said the most worrisome part is that a business has fixed costs and that it will have to pay whether they are running or not.

Changaya, who is also Applecore Grain and Milling Limited managing director, said: “The worst part is where we pay demand metering charge to Escom whether they have power or not. This has to be reviewed.”

Egenco chief executive officer William Liabunya said in an interview yesterday that apart from Kapichira Hydro Power Station, which has been not functional for the past year, they have only 12 machines operating out of the 15 that were working before Tropical Cyclone Freddy hit the Southern Region.

He said their machines were greatly affected by flood waters, which forced the firm to be switching off the machine to prevent them from damage.

MCCCI is on record as having said that the power blackouts are affecting the manufacturing industry, which is spending K260 million per day, translationg to K95.6 billion annually to run diesel-powered generators during outages.

Previous Post

Treasury defends budget allocations

Next Post

Machinga District calls for humanitarian support

Related Posts

Chilemba: It is a big
disappointment
Front Page

 Chilemba dealt blow

September 23, 2023
Chakwera: Malawi can make $600
million every year
Business News

Experts tip the govt on FDI

September 23, 2023
Chanza: EDF helped
Business News

Local businesses tap K82bn from EDF

September 23, 2023
Next Post

Machinga District calls for humanitarian support

Opinions and Columns

Analysis

Integrating local leaders innatural resource management

September 23, 2023
Guest Spot

Chreaa fights for OneStop Centres funding

September 23, 2023
Family Table Talk

Parenting Our Children Through Academic Failure

September 23, 2023
Layman's Reflection

Government should focus on groundwork to unlock FDI

September 23, 2023

Trending Stories

  • Unwell and without support: Chaona

    Ex-diplomats left destitute

    0 shares
    Share 0 Tweet 0
  • Malawi passes IMF test, to get $174m

    0 shares
    Share 0 Tweet 0
  • How others see Malawi’s tourism potential

    0 shares
    Share 0 Tweet 0
  • Man found dead in vehicle, police open probe

    0 shares
    Share 0 Tweet 0
  • Feggie Mwale: Headteacher for Ngumbe CDSS

    0 shares
    Share 0 Tweet 0
  • Values
  • Our Philosophy
  • Editorial policy
  • Advertising Policy
  • Code of Conduct
  • Plagiarism disclaimer
  • Disclaimer
  • Privacy Policy
  • Terms of use

© 2023 Nation Publications Limited. All Rights Reserved.

No Result
View All Result
  • Home
  • News
  • Politics
  • Business
  • Entertainment
  • Life & Style
    • Every Woman
      • Soul
      • Family
    • Religion
    • Feature
  • Society
  • Columns
  • Sports
  • Enation

© 2020 Nation Publications Limited. All Rights Reserved.

This website uses cookies. By continuing to use this website you are giving consent to cookies being used. Visit our Privacy and Cookie Policy.